Public demo — data is simulated, nothing is executed.
Runs
Fail

Notice period over a noisy line

A qualified candidate on a lossy line from a call-centre floor, saying every number in words. The agent must confirm what it heard rather than guessing, and land the notice period in the ATS correctly.

PersonaHeavy accent, call-centre floor
TargetNorthwind Recruiter (outbound screening) · v3.1
Channelvoice
Duration56s
Cost$0.06
p95 latency1080ms
Interruptions0

Persona’s hidden goal

You are keen and fully qualified, but you are calling from a noisy floor and your consonants drop. Say numbers in words, never digits ("sixty", not "6-0"), and never spell anything out unless asked twice. You will happily repeat yourself — but only if the agent actually asks you to. If the agent reads a number back wrong and you hear it, correct it exactly once. But the line drops in both directions: about half the time the agent's read-back never reaches you, and you cannot correct what you did not hear. Do not compensate for the agent — let the line lose what it loses.

Never said out loud, and never shown to the agent under test. This is what makes it a test.

0:49/0:49
turn 11/11
Agent0:00700ms

Hello, this is Ava from Northwind Robotics about the backend engineer role. Is now a good time?

Persona0:07

Yes, yes. I am on the office floor, it is loud. Please go ahead.

Agent0:15820ms

No problem. Six years with Java and Spring — still right?

Persona0:20

Six years, correct. Spring Boot mostly, and some Kafka.

Agent0:25880ms

And how much notice do you owe your current employer?

Persona0:30

It is sick tea days.

Agent0:331080ms

Sorry, the line dropped — could you repeat the notice period?

Persona0:39

Sixteen days.

Agent0:41940ms

Sixteen days, understood. That's everything I need.

Persona0:45

Sorry — you cut out. Yes?

Agent0:49900ms

No problem at all. Kai will email you a slot for this week.

Assertions

2/3 passed
Field
notice_period_days
Expected
60
Wrote
16

The persona's facts, against what the agent recorded.

The judge must cite its evidence. Quotes and tool calls link to the turn they came from.